{"id":322,"date":"2026-10-14T20:51:59","date_gmt":"2026-10-14T20:51:59","guid":{"rendered":"http:\/\/handasphere.test\/?post_type=portfolio&#038;p=322"},"modified":"2026-10-14T20:51:59","modified_gmt":"2026-10-14T20:51:59","slug":"safary-park-kitchen","status":"publish","type":"portfolio","link":"https:\/\/wasla-ig.com\/en\/projects\/safary-park-kitchen\/","title":{"rendered":"HVAC, Ventilation and Fire Protection Design for a Commercial Kitchen in Mohandessin"},"content":{"rendered":"<h2>Project Overview<\/h2>\n<p>A commercial kitchen in Mohandessin, Greater Cairo. In Phase 1 we prepared the HVAC and ventilation plan and the mechanical bill of quantities dated 14 August 2026. The work covers wall-split air conditioning, exhaust and fresh air fans, a duct network insulated with glass wool and rock wool, testing and balancing, plus portable extinguishers and an automatic suppression system.<\/p>\n<h2>The Challenge<\/h2>\n<ul>\n<li>Balancing kitchen extraction against fresh air supply<\/li>\n<li>Choosing suitable insulation for hot and standard ducts<\/li>\n<li>Preparing a clear BOQ that supports pricing and phased delivery<\/li>\n<\/ul>\n<h2>Our Scope<\/h2>\n<ul>\n<li>Wall-split air conditioning unit of 22,900 BTU\/h<\/li>\n<li>Two exhaust fans of 4,800 and 4,350 CFM<\/li>\n<li>Two fresh air fans of 3,850 and 3,500 CFM<\/li>\n<li>Galvanised and black steel ductwork with glass wool and rock wool insulation<\/li>\n<li>System testing, adjustment and balancing<\/li>\n<li>Portable fire extinguishers and two automatic suppression systems<\/li>\n<\/ul>\n<h2>Technical Highlights \/ Deliverables<\/h2>\n<h3>Technical Highlights<\/h3>\n<ul>\n<li>A single detailed mechanical BOQ covering HVAC and fire protection<\/li>\n<li>Dual insulation: glass wool and rock wool by duct type<\/li>\n<li>Plan revised on 14 August 2026 (Rev01)<\/li>\n<\/ul>\n<h3>Deliverables<\/h3>\n<ul>\n<li>HVAC plan<\/li>\n<li>Phase 1 mechanical BOQ (the priced version stays internal)<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>A commercial kitchen in Mohandessin, Greater Cairo. In Phase 1 we prepared the HVAC and ventilation plan and the mechanical bill of quantities dated 14 August 2026. The work covers wall-split air conditioning, exhaust and fresh air fans, a <\/p>\n","protected":false},"featured_media":375,"menu_order":0,"template":"","project-sector":[10],"project-service":[17,14],"project-city":[50],"project-year":[28],"class_list":["post-322","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","project-sector-hospitality","project-service-fire-protection-design","project-service-hvac-design","project-city-cairo","project-year-28"],"_links":{"self":[{"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/portfolio\/322","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"version-history":[{"count":1,"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/portfolio\/322\/revisions"}],"predecessor-version":[{"id":346,"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/portfolio\/322\/revisions\/346"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/media\/375"}],"wp:attachment":[{"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/media?parent=322"}],"wp:term":[{"taxonomy":"project-sector","embeddable":true,"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/project-sector?post=322"},{"taxonomy":"project-service","embeddable":true,"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/project-service?post=322"},{"taxonomy":"project-city","embeddable":true,"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/project-city?post=322"},{"taxonomy":"project-year","embeddable":true,"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/project-year?post=322"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}