{"id":324,"date":"2026-10-14T20:51:57","date_gmt":"2026-10-14T20:51:57","guid":{"rendered":"http:\/\/handasphere.test\/?post_type=portfolio&#038;p=324"},"modified":"2026-10-14T20:51:57","modified_gmt":"2026-10-14T20:51:57","slug":"eagle-innovation-office","status":"publish","type":"portfolio","link":"https:\/\/wasla-ig.com\/en\/projects\/eagle-innovation-office\/","title":{"rendered":"MEP Design for an Administrative Office: Chilled-Water HVAC, Plumbing and Fire Protection"},"content":{"rendered":"<h2>Project Overview<\/h2>\n<p>An administrative building at Hyde Park, Cairo, with a 48 m\u00b2 main hall (20 occupants) and 24 m\u00b2 of offices. We started with load calculations in Carrier HAP 5.10 (about 28.6 MBH peak cooling for the main hall), then designed three ducted fan coil units tied into the chilled-water loop with BTU meters, together with plumbing, AC condensate drainage, a sprinkler network and extinguishers. Drawings were issued in October 2025 and revised through Rev03.<\/p>\n<h2>The Challenge<\/h2>\n<ul>\n<li>Small spaces with relatively high loads (a 20-person hall) and limited ceiling void<\/li>\n<li>Tying into an existing chilled-water loop with BTU meters and balancing valves<\/li>\n<li>Coordinating 1% fall for condensate drains above the ceiling<\/li>\n<\/ul>\n<h2>Our Scope<\/h2>\n<ul>\n<li>Load calculations for the main hall (28.6 MBH) and offices (12.0 MBH)<\/li>\n<li>Three chilled-water fan coils: 1.5, 0.825 and 1.0 TR (700, 300 and 510 CFM)<\/li>\n<li>Chilled water at 44.6 to 53.6 \u00b0F with BTU meters and balancing valves<\/li>\n<li>Cold and hot water, drainage and AC condensate drainage<\/li>\n<li>Pendent sprinklers (68 and 79 \u00b0C), supervised valves, flow switch, 25 mm \u00d7 30 m hose reel and extinguishers<\/li>\n<li>Coordination drawings, installation details and ceiling layouts<\/li>\n<\/ul>\n<h2>Technical Highlights \/ Deliverables<\/h2>\n<h3>Technical Highlights<\/h3>\n<ul>\n<li>HAP calculation reports for the hall and offices<\/li>\n<li>Chilled-water network with a BTU meter per unit<\/li>\n<li>A full drawing set: HVAC, piping, drainage, fire protection and coordination<\/li>\n<\/ul>\n<h3>Deliverables<\/h3>\n<ul>\n<li>Load calculation reports (main hall and offices)<\/li>\n<li>Fan coil schedule, ducting and piping drawings<\/li>\n<li>Plumbing, drainage and AC condensate drawings<\/li>\n<li>Fire protection layout and installation details<\/li>\n<li>Composite and ceiling layout drawings<\/li>\n<li>Fan coil selection (technical data sheet)<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>An administrative building at Hyde Park, Cairo, with a 48 m\u00b2 main hall (20 occupants) and 24 m\u00b2 of offices. We started with load calculations in Carrier HAP 5.10 (about 28.6 MBH peak cooling for the main hall), then designed three ducted fa<\/p>\n","protected":false},"featured_media":376,"menu_order":0,"template":"","project-sector":[9],"project-service":[17,14,16],"project-city":[50],"project-year":[28],"class_list":["post-324","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","project-sector-commercial","project-service-fire-protection-design","project-service-hvac-design","project-service-plumbing-design","project-city-cairo","project-year-28"],"_links":{"self":[{"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/portfolio\/324","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"version-history":[{"count":1,"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/portfolio\/324\/revisions"}],"predecessor-version":[{"id":340,"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/portfolio\/324\/revisions\/340"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/media\/376"}],"wp:attachment":[{"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/media?parent=324"}],"wp:term":[{"taxonomy":"project-sector","embeddable":true,"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/project-sector?post=324"},{"taxonomy":"project-service","embeddable":true,"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/project-service?post=324"},{"taxonomy":"project-city","embeddable":true,"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/project-city?post=324"},{"taxonomy":"project-year","embeddable":true,"href":"https:\/\/wasla-ig.com\/en\/wp-json\/wp\/v2\/project-year?post=324"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}