Suppression Systems
Suppression-system selection and layouts are developed according to the building use, hazard and applicable project requirements.
INTEGRATED ENGINEERING SOLUTIONS
Fire suppression and alarm design developed around SBC, Civil Defense and NFPA requirements.
Our fire-protection design service develops suppression and alarm-system requirements in coordination with the building use, hazard, architecture and other MEP disciplines. The approval and authority scope is confirmed for each project before final deliverables are issued.
Fire-hazard and system basis review
Sprinkler-system layouts
Standpipe and hose-system coordination
Fire-pump and water-supply requirements
Fire-alarm device layouts
Cause-and-effect / system coordination where required
Civil Defense design coordination
Drawings, calculations and BOQ deliverables
Suppression-system selection and layouts are developed according to the building use, hazard and applicable project requirements.
Fire-alarm device coverage and system layouts are coordinated with architecture and the agreed life-safety scope.
Where included in the project scope, documentation is prepared in line with the applicable Saudi Civil Defense approval requirements.
Final requirements are confirmed against the project type, location, authority and approved project scope.
Drawings, brief and authority requirements.
Calculations and discipline drawings.
Review with architecture and other MEP systems.
Issued drawings, reports and agreed deliverables.
Architecture, structure and MEP for villas and residential compounds with permit-ready drawings per the Saudi Building Code.
COOffices, retail and commercial buildings designed for efficiency, permits and coordination across architecture, structure and MEP.
HOHotels, resorts and restaurants: architecture, interiors, kitchens, ventilation and MEP engineered for continuous operation and guest comfort.
HOClinics and hospitals with infection control, medical gases, air pressure and power reliability engineered to authority rules.
FAFactories, warehouses and logistics sites with structural, MEP and fire protection designed for operations and permits.
TOTowers and mixed developments with full coordination across architecture, structure and MEP using BIM.
The approval path depends on the project type, location and authority process. The design and documentation are prepared around the applicable Civil Defense requirements when approval support is included in scope.
System selection depends on the protected space, hazard, occupancy and authority requirements. The appropriate system is selected during the design process.
Fire-alarm design can be included as part of the coordinated fire-protection scope.
Approval duration depends on project complexity, authority workflow, document readiness and review comments, so it is confirmed case by case.
Send us your project details and we will review the required scope.
Contact Us →We use essential cookies for site functionality and optional analytics cookies to understand website usage.