MEP SERVICE

Plumbing and Drainage Design in Saudi Arabia

Water supply, drainage and stormwater design coordinated around SBC and project requirements.

OVERVIEW

Plumbing and Drainage Design in Saudi Arabia Overview

Our plumbing design service covers water-supply, drainage and stormwater systems with coordinated layouts, calculations and equipment requirements. The design is developed around the project use, architectural information and the applicable Saudi requirements identified for the project.

SCOPE OF WORK

What This Service Covers

✓

Water-demand calculations

✓

Domestic water-supply layouts

✓

Drainage and vent layouts

✓

Stormwater design

✓

Pipe sizing and routing

✓

Tank and pump-room coordination

✓

Sanitary fixture coordination

✓

Drawings, calculations and BOQ deliverables

TECHNICAL DESIGN

Engineering Approach

Water Supply

Water demand, storage, pumping and distribution are developed according to the project use and agreed design criteria.

Drainage

Sanitary drainage and vent systems are sized and routed in coordination with the architecture and structural constraints.

Stormwater

Roof and site stormwater requirements are incorporated where they are included in the project scope.

STANDARDS & AUTHORITIES

Designed Around Applicable Requirements

Final requirements are confirmed against the project type, location, authority and approved project scope.

SBC 701National Water Company requirementsMunicipality requirements
DELIVERY STAGES

A Clear Engineering Workflow

01

Inputs

Drawings, brief and authority requirements.

02

Design

Calculations and discipline drawings.

03

Coordination

Review with architecture and other MEP systems.

04

Handover

Issued drawings, reports and agreed deliverables.

DELIVERABLES

What You Receive

✓Water-supply drawings
✓Drainage and stormwater drawings
✓Hydraulic calculations
✓Design reports
✓Bill of quantities (BOQ)
FAQ

Frequently Asked Questions

Which drawings are needed for plumbing permits?

The required drawings depend on the project and approving authority. The design package is prepared around the applicable requirements and agreed scope.

Do you design tanks and pump rooms?

Yes, tanks and pump-room requirements can be included where they form part of the agreed plumbing design scope.

Is stormwater included?

Stormwater design can be included in the plumbing scope when required for the project.

What does it cost?

Pricing depends on project type, area, complexity, required systems and deliverables. A project-specific quote is prepared after reviewing the available inputs.

START YOUR PROJECT

Request a Quote for Plumbing and Drainage Design in Saudi Arabia

Send us your project details and we will review the required scope.

Contact Us →




    WhatsApp